Want to hear everything that’s planned for the UMC’s 2nd floor?
Come to the UMC Renovations – 2nd Floor Update, Monday, Feb. 29, 6 to 7 p.m. in The Gallery (on the second floor to the left of the Reception Desk).
The renovations coming to the UMC 2nd floor include the expanded Veterans Lounge, Underrepresented Student Lounge Area and meeting rooms for student orgs. Get an overview of the design, color scheme and layout. Find out more!.